• Install automatic doors, renovate bathroom and install a lift to make the facility more accessible for those with mobility issues

  • Install a forced air furnace in the basement

  • Install two new water fountains in the facility

  • Install new time clock in hockey arena

2018

  • Installed new LED lights in arena

  • Installed new T8 lighting in all viewing areas 

  • Installed new T5 lighting in curling arena

  • Installed a new forced air furnace in the upper viewing area

  • Rebuilt ice resurfacer to new specifications

2015

  • Installed 30” of insulation in the attic of facility

  • Installed floor heat in Room 4

2012

  • Installed new boards in hockey arena

  • Installed new glass and safety netting in hockey arena

  • Installed two new brine pumps

  • Installed new sound system in hockey arena and upper viewing area

  • Installed insulation and tin in the curling arena

2017

  • Upgraded the curling scoreboards with new fronts and lights

  • Added Styrofoam around the foundation of the outside of building for extra insulation

2014

  • Installed a dehumidifier in hockey arena

  • Installed security system

2016

  • Added free wifi

2013

2019 Wawanesa Rink
  • Black Facebook Icon
  • Black Twitter Icon